Western Red Cedar hand scribed log home 
The site, previous to strat of construction, winter of 2005/06.
The site, previous to strat of construction, winter of 2005/06.
Viewed: 248 times.

Another angle on the raw site.
Another angle on the raw site.
Viewed: 267 times.

A lot of blasting was required for the foundation and basement. Here, the drill rig is drilling holes for the charges.
A lot of blasting was required for the foundation and basement. Here, the drill rig is drilling holes for the charges.
Viewed: 186 times.

...all that blast rock needed to be taken away...
...all that blast rock needed to be taken away...
Viewed: 217 times.

The footing excavation is beginning to take shape.
The footing excavation is beginning to take shape.
Viewed: 228 times.

Viewed: 215 times.

Viewed: 225 times.

The foam insulation and Wirsbo tubing are in for the in-floor heating system in the basment...
The foam insulation and Wirsbo tubing are in for the in-floor heating system in the basment...
Viewed: 253 times.

...and the basement floor slab is finished.
...and the basement floor slab is finished.
Viewed: 285 times.