Lake Vermilion project, completed. 
We had to blast just about the enitire hole to get our walk out basement. The site was solid rock.
We had to blast just about the enitire hole to get our walk out basement. The site was solid rock.
Viewed: 581 times.

We built a shute to get the concrete down into the hole for the footings.
We built a shute to get the concrete down into the hole for the footings.
Viewed: 434 times.

Logix Insulated Concrete forms. The first day...
Logix Insulated Concrete forms. The first day...
Viewed: 454 times.

The ICF walls completed.
The ICF walls completed.
Viewed: 438 times.

Here we are packing up the Telebelt after pouring the ICF walls. The Telebelt is a telescoping conveyor for moving concret or dirt, owned and operated by Low Impact Excavators of Ely. It works well for getting concrete to hard to reach places such as ICF walls like these.
Here we are packing up the Telebelt after pouring the ICF walls. The Telebelt is a telescoping conveyor for moving concret or dirt, owned and operated by Low Impact Excavators of Ely. It works well for getting concrete to hard to reach places such as ICF walls like these.
Viewed: 560 times.

Here, we have the sub-floor built. Now we are ready for the log walls.
Here, we have the sub-floor built. Now we are ready for the log walls.
Viewed: 429 times.

We have brought the logs to the site after pre-assembling the walls at another site over the winter.
We have brought the logs to the site after pre-assembling the walls at another site over the winter.
Viewed: 453 times.

They have been numbered and go back together fairly quickly.
They have been numbered and go back together fairly quickly.
Viewed: 422 times.

Powered by Gallery v1 RSS