Lake Vermilion project, completed.  

Here we are packing up the Telebelt after pouring the ICF walls. The Telebelt is a telescoping conveyor for moving concret or dirt, owned and operated by Low Impact Excavators of Ely. It works well for getting concrete to hard to reach places such as ICF walls like these.

Here we are packing up the Telebelt after pouring the ICF walls. The Telebelt is a telescoping conveyor for moving concret or dirt, owned and operated by Low Impact Excavators of Ely. It works well for getting concrete to hard to reach places such as ICF walls like these.


Powered by Gallery v1 RSS